Add to Favorites | 中文版
Operating rules of die casting machine of J1512 vertical cold room
From;    Author:Stand originally
The biggest die-casting (aluminium alloy) weight: Time of circulation of 1.8 kilograms of jobs: 70-120 second / when 1, abide by " cast installation current operating rules " concerned regulation. 2, quantity of inspection job fluid, add the emulsion that by the manual the regulation makes up when necessary. 3, forbid pneumatics to shoot commonly, be like must when pneumatics is shot, must be in pressure shoot soft qualitative mat is put to expect in the room (wait like cotton thread, lead piece) , prevent attaint facility. 4, start facility by next face order, try other action for nothing: A, receive electrify source, open lay aside to press crock cut down, control next self-adjusting lever, pump of the high pressure that start, after pump movement is normal, unlock afore-mentioned lever; B, open machine total attack, operate respectively the handle of each movement and footplate, it is normal to examine each actions, after affirming everything is normal, fangke has production. 5, cogent attention is safe, handlers must apparel things of good labor insurance, must not stand in be opposite position of die-casting cent side has the job, prevent aluminous water slop, produce burn accident. 6, often observe whether all sorts of appearance reading accord with craft requirement, the motion of equipment is normal, if discover unusual appearance, must instantly board move handwheel of total cut down, shut lay aside presses crock cut down or stop pump to undertake checking, inform maintenance technician is repaired when necessary. 7, the temperature rise that often notes working fluid, temperature is highest must not exceed 40° С , must force otherwise cooling. 8, equipment stop doing business when a hour of above, must stop mechanism attack, prevent to produce equipment person accident and reduce kinetic energy to use up. 9, after the job, jockey by following order: When equipment is in pressure release condition, close pump to jockey, dump, shut total cut down and lay aside to press crock cut down. 10, after equipment clears, the athletic section of equipment (the lever that be like a crock, guide bar, slippery course) still need Tu Yi layer small machine is oily.

About us | Legal Notices | Sitemap | wiki

Disclaimer:The only purpose of the site is to deliver more information. This dose not mean that the site will agree with the views and be responsible for its authenticity.